The sidewalks were torn out to make way for new stamped concrete sidewalks and a patio out back.
We are also getting a new storage shed out back that will have an attached tractor port - you know, like a carport but for the tractor.
We hired a masonry crew to lay the block.
Filling in the foundation
The tractor had been getting a workout with all the projects.
The yard is going to need major work when this is all done, but I am so glad we are able to get it finished. It is great to have a son-in-love who is a contractor and enjoys trying out new techniques at our house. Thanks Tony!
Tony had to remove some of the steps from the deck and the front porch steps to pour the concrete.
The patio are for the basement apartment was prepped. Our HVAC company came out and moved the outdoor unit so we could pour the patio and then came back to reconnect everything after the patio was finished. We had a couple of warm days with out the air conditioner, but we survived.
It was a lot of work to prep for these two projects. I have the easy job, I just write the checks :-)
Finally a day without rain so we could get the concrete poured.
Tony hired a couple of guys who do concrete jobs on the side. They worked well with Tony and his crew. Tony is awesome about networking, working with and learning from people who have skills and talents he wants to develop.
It was fascinating to watch. We ordered cool gray concrete. Then we were accenting with charcoal color for the stamping.
We had two concrete deliveries. One in the morning for the front sidewalks and partway down the hill to the back and a second delivery in the afternoon for the rest of the sidewalk down to the deck side stairs and the back patio for the apartment.
They got it all smmothed out
Then the charcoal color was spread in small sections and the stamping process began.
It was an interesting process.
After day one.
Day two was taking off forms, washing with a special solution to remove some of the extra charcoal color
and cutting. You have to make cuts in the concrete to lessen the cracking that can occur with the contracting and expanding due to temperature changes.
The third day was sealing
and then celebrating!
Sarah is thrilled to have a patio outside of her door.
Ellie meanders down the front walk.
Ellie and her Papa take a rest on the gravel pile. Gary will be using the gravel for some paths in the garden area.



























0 comments:
Post a Comment