Sunday, May 19, 2019

Aina House Update

Yeah for a roof!

Tony rigged up a swing for the girls. Adeline loves swinging. 

Of course, Isla has to get in on the action too. 

She didn't want to get out. 

Adeline wanted to know if the swing was going to stay. 

Finishing the roof.

Shingles done. 

View from the backyard. 

Second floor framing. 

The upstairs is all framed. Sarah was standing in the apartment to take this picture. 

Two bedrooms framed here.

Kitchen and living area in the apartment.  The framing is the bathroom, laundry and pantry in the apartment. 

Front closet

Bathroom framing finished

The mudroom is framed

Siding has arrived.  The house will be blue with white trim and some green accents. 

Two rooms and a closet are framed here

Hall bath and a closet on the left side by the front door. 

0 comments: